| |
|
|
| Repairing the subfloor, building the shower curb and reinforcing the walls around the shower pan. |
 |
|
 |
 |
|
 |
| |
 |
| |
|
|
| Membrane protecting the plywood subfloor. I precut the pre-slope sticks. they will be placed later above the shower liner. |
 |
|
 |
 |
|
 |
| |
|
|
| First layer of concrete mud floor was done. Next step: installing the shower liner, pre-sloped sticks, then pourring another layer of concrete mud floor with the right slope. |
 |
|
 |